All services

QS-06Estimates, planning & roads

Cost Estimation & Quantity Surveying

Preliminary and detailed estimates cover work volumes, labor, equipment, and materials. Each project is assessed individually rather than with fixed pricing.

Estimates, Bill of Quantities and Design Documentation — BOOKKEEPERS GROUP

From site measurements to the bill of quantities

We carry out site measurements and prepare a defect report. On this basis we prepare the design and estimate documentation: the cost estimate, bill of quantities and material specification, ready for submission to the State Main Expertise Department.

Estimates we prepare

  • Design and estimate documentation for landscaping and road repair
  • Capital and routine repair estimates for buildings
  • Estimates and BOQ for new construction
  • Bills of quantities for tender documents
  • Repair estimates based on defect reports

Coordinated project outputs

  • Bills of quantities
  • Material schedules
  • Labor and equipment
  • Option comparison
  • Budget optimization

Projects in this service

All projects

Göygöl2026

Goygol District Executive Authority

  • Architecture
  • Cost Estimation
  • Parks & Public Spaces
  • Urban & Master Planning

Preparation of project and estimate documentation for landscaping work within the city of Göygöl. The project involves major renovation work around the Flag Square, the restoration of sidewalks and pavements on 5 streets, renovation work at the city’s Central Stadium, and renovation of the park in Azay Kazımov Street, 21st neighborhood, including the installation of sports and children’s entertainment equipment. Completed: master plans of the area, estimates, and the Construction Organization Project have been prepared, and a positive review has been obtained by promptly addressing the comments of the State Main Expertise Department of the Ministry of Emergency Situations. The image is a design visualisation.

View project

Şirvan2026

Shirvan City Municipal Services Enterprise

  • Architecture
  • Cost Estimation
  • Landscape Design
  • Parks & Public Spaces
  • Urban & Master Planning

Preparation of design and cost-estimate documentation for landscaping and urban improvement works in the city of Shirvan. Status: finished. Master plans for the project area are fully prepared. The project provides for the installation of new outdoor fitness equipment, children’s play areas, and wooden benches. It also includes the replacement of deteriorated paving surfaces, including interlocking paving stones, sidewalk slabs, and concrete curbstones. The image is a design visualisation.

View project

Cəlilabad2026

Jalilabad District Executive Authority

  • Architecture
  • Cost Estimation
  • Landscape Design
  • Parks & Public Spaces
  • Urban & Master Planning

Preparation of design and cost-estimate documentation for landscaping and urban improvement works in the cities of Jalilabad and Goytepe. Status: finished. Master plans for the project areas are fully prepared. The ongoing scope includes the design of renovation works around the monument to National Leader Heydar Aliyev, improvement works surrounding Flag Square, and the restoration of sidewalks and pavement surfaces along five streets. The image is a design visualisation.

View project

Kürdəmir2026

Kurdamir District Executive Authority

  • Architecture
  • Cost Estimation
  • Landscape Design
  • Parks & Public Spaces
  • Roads & Infrastructure
  • Urban & Master Planning

Preparation of design and cost-estimate documentation for the major renovation of urban roads in Kurdamir, financed from state budget funds. Topographic surveys and on-site measurements were carried out, and a detailed Defect Report was prepared. Based on the Defect Report, the cost estimate was calculated, and the Architectural Design section, together with the Construction Organization Plan, was submitted to the State General Expertise Department of the Ministry of Emergency Situations and received a positive expert opinion. The image is a design visualisation.

View project

Frequently asked questions

Are estimates prepared for the state expert review?

Yes. Estimates use current norms and prices in the format required by the State Main Expertise Department. Our Göygöl, Şirvan, Kürdəmir and Daşkəsən projects received positive reviews.

What is a BOQ?

A Bill of Quantities lists work and material quantities. It is used for tenders, contractor selection and budget control.

What does the price of an estimate depend on?

On the size of the project, the number of work types and whether site measurements are needed. We quote after reviewing the project.

Let’s map the technical path for your project.

Send a plan, technical document, or early idea. The team can shape the right multidisciplinary project scope.